Project record
The brief, and the technical scope we delivered.
Project context · technical response · delivery
01The brief
Bounce and Groove was a new three-day, multi-genre festival in Dorset in July 2024, with a main stage, DJ stage, cabaret tent and family area. Like many festivals that year, ticket sales arrived late and below forecast, so the production had to be reshaped as the event approached.
02Our responsibility
Soundfangled led technical production and site management, and worked with the festival team as production consultants: planning the site, coordinating suppliers and crew, and restructuring the production budget as the picture changed.
02 · Control02 / Control
Operator at the mixing console during a performance at Bounce and Groove Festival.
03 · Site03 / Site
Aerial view of the stages, audience areas and surrounding fields at Bounce and Groove Festival.
Technical response
What we delivered.
- 01Sound system design and installation
- 02Lighting design, installation and operation
- 03Monitors and show control
- 04Site power distribution
- 05Site layout and day-to-day site management
- 06Supplier and contractor coordination
- 07Production budget restructuring
- 08Build, three-day show and breakdown
Services
Services on this project.
Related work.
All work
View case studyWe Out Here
Technical production management for a four-day, 25,000-capacity festival: 15 stages and 22 technical areas, run from one production office.
View case studyA L P H A B E T Music Venue, Brighton, UK
Audio system design, full system integration and AV installation alongside stage construction, sound isolation, resonators and diffusion.
View case studyRotary Connection 222 at We Out Here
Production management, audio, crew and rehearsals for Rotary Connection 222's headline show at We Out Here 2025, an orchestral celebration of Charles Stepney.
Outcome
Production
A new festival, brought in at break-even.
Soundfangled restructured the production budget as plans changed, and the festival broke even instead of losing an estimated £30,000 or more. The build, live weekend and breakdown all ran to plan.